Well Site Preparation and Drilling Safety

[vc_row][vc_column][vc_column_text] Rigging Up Rigging up is placing and assembling the various parts of equipment that make up the rig, and preparing the rig for drilling. There are many rig designs, and this course does not cover each type individually. This course focuses on the common hazards and solutions that many rig designs share. During assembly […]

[vc_row][vc_column][vc_column_text]

Rigging Up

Rigging up is placing and assembling the various parts of equipment that make up the rig, and preparing the rig for drilling.

There are many rig designs, and this course does not cover each type individually. This course focuses on the common hazards and solutions that many rig designs share.

During assembly of the rig, some equipment may be handled and set with cranes, rig up trucks, or forklifts, depending on the size of the rig. It should be noted that overhead hazards such as high voltage power lines may be present.

There may be two or more crews (teams) working together in the rigging up process. The rigging up process includes the following steps, some of which are done simultaneously.

 

Setting up the Substructure

structure

Equipment is unloaded and positioned at or near the exact location that it will occupy during operations.

The substructure is assembled, pinned together, leveled, and made ready for other rig components on the floor.

Equipping the cellar begins but can be done throughout the rigging up process. This includes welding on a drilling nipple to the conductor pipe and attaching a flow line.

Potential Hazards:

  • being struck by the crane, load, truck, or forklift tipping
  • pinched fingers when assembling equipment
  • burns from cutting and welding on the drilling nipple
  • temporary eye irritation from welding light flash
  • falling from heights

Possible Solutions:

  • Instruct all workers in safety procedures and ensure that they are knowledgeable about job hazards. This can be done during pre-job safety meetings or JSA briefings.
  • Instruct workers to stand clear and keep hands and other body parts away from pinch points
  • Wear proper long sleeve clothing to protect from burns.
  • Wear proper welding eye/face protection.
  • Avoid looking directly at the flame or arc when welding.
  • Wear fall protection when working from heights. 

 

Setting Up the Rig Floor and Mast or Derrick

raising dog house

Once the substructure is set in place, the process of setting up the rig floor begins. Begin by installing stairways and guardrails to allow access to the rig floor. Then, the drawworks is set in place and secured to the substructure. On mechanical rigs, the engines are set in place; the compound and associated equipment are connected to the drawworks. On electric rigs, the electric cables (lines) are strung to the drawworks.

The bottom of the mast is then raised to the rig floor and pinned in place. The crown section is then raised into place on the derrick stand. The “A-legs” are raised and pinned into place. The monkeyboard is pinned in place on the mast and all lines and cables are laid out to prevent tangling when the mast is raised. A thorough inspection of the mast should be made before raising the mast/derrick.

The mast is now ready to be raised. The engines are started, and the drilling line is spooled onto the drawworks drum. Once the mast has been raised and pinned, the remaining floor equipment can be set into place. If the rig has safety guylines, they must be attached to the anchors and properly tensioned prior to continuing the rigging up process. A derrick emergency escape device is installed on the mast.

 

Setting Up the Rig Floor and Mast or Derrick (Continued)

Potential Hazards:

  • falling or tripping during rigging up
  • falling from rig floor
  • being struck by swinging equipment
  • being struck by falling tools
  • being crushed or struck by equipment due to failure or overloading of hoisting equipment
  • getting entangled in lines during raising of the derrick or mast
  • failure to properly install derrick emergency escape device

Possible Solutions:

  • Install, inspect, and secure stairs and handrails.
  • Do not use guardrails for anchor points or for lifting or supporting loads.
  • Use fall protection when installing or removing guardrails.
  • Use a tag line to guide equipment, rather than positioning yourself under suspended loads.
  • Check the derrick for unsecured tools before raising it.
  • Allow only the operator raising the mast to be on the rig floor.
  • Uncoil all lines so that they are clear of all workers when the mast or derrick is raised.
  • Attach safety lines to all tools hanging from the rig.
  • Keep a safe distance from moving equipment.
  • Install derrick emergency escape device properly in accordance with manufacturer’s recommendations.

source: OSHAcademy

 

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_btn title=”Jadwal Training 2017″ align=”center” link=”url:http%3A%2F%2Findohes.com%2Fpembinaan-dan-sertifikasi-ahli-k3-umum-sertifikasi-kemnaker-jadwal-2017%2F||” button_block=”true”][/vc_column][/vc_row]

Testimoni Peserta

Berikut suara pelanggan yang sudah menggunakan layanan kami.

4.6 Rating dari 51 Review

Posted on Google Google
Yustinus Ngadiran profile picture
Yustinus Ngadiran
19 September 2025
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Mengurus perpanjangan SKP K3U, sesuai jadwal.
Posted on Google Google
Agung Kurnianto profile picture
Agung Kurnianto
19 August 2025
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Good service
Posted on Google Google
Angga Setia profile picture
Angga Setia
4 August 2025
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
cukup baik dilayani cepat bisa di cicil 2x, cuma untuk pelayanan pengiriman SKP jika sudah jadi harap pengirimannya di perjelas diberikan resi pada saat pengiriman, jadi pelanggan bisa ngecek kapan estimasi tiba dan siap2 untuk menunggu SKP datang ( mengingat dokumen ini sangat penting takut hilang) , terimakasih
Posted on Google Google
Accounting PDM profile picture
Accounting PDM
31 July 2025
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Terima kasih atas pelayanan yang sangat baik dan ramah
Posted on Google Google
Dama Ramadhany profile picture
Dama Ramadhany
31 July 2025
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Trusted Vendor for Safety certification 👌
Posted on Google Google
Zsa Zsa Dwita Sari profile picture
Zsa Zsa Dwita Sari
29 July 2025
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
fast response and trusted PJK3. highly recommend for this vendor, thankyou indohes

Jangan menunggu deadline,
amankan kursi anda hari ini dengan klik link di bawah

Konsultasi Gratis!

Terhubung dengan tim Indohes untuk pelatihan, sertifikasi, dan jasa konsultan K3.